Office Strip Outs in Sydney

An office strip-out in a Sydney tower is mostly logistics: lifts, docks, hours, services and neighbours. The removal itself is the easy part once those are sorted.

Licence and insurance details are provided on your discovery call, or whenever you ask. Request them →

  • 01 Scope agreed in writing
  • 02 Services isolated by licensed trades
  • 03 Asbestos register checked
  • 04 Waste sorted and removed
  • 05 Clean shell on the handover date

What an office strip-out covers

  • Partitions — plasterboard walls, glazed offices, operable walls.
  • Ceilings — tenant ceiling grids and tiles, bulkheads.
  • Joinery — reception desks, kitchenettes, storage walls.
  • Floor coverings — carpet tiles, vinyl, raised floor where specified.
  • Services — redundant data and power cabling, tenant lighting, supplementary air conditioning, comms rooms.
  • Signage and fixtures.

The scope is set by the lease make-good clause, the landlord's requirements or the incoming fit-out drawings. See lease make good.

Services first

Before anything is cut:

  • Electrical isolated and made safe by a licensed electrician.
  • Data identified — what is redundant and what stays.
  • Mechanical — supplementary units disconnected, base building air handling protected.
  • Fire services — sprinklers, detectors and EWIS coordinated with the building's fire contractor.
  • Plumbing — kitchenettes and amenities capped by a licensed plumber.

Working in an occupied tower

Requirement Typical approach
Noise Heavy and noisy works after hours or weekends
Lifts Goods lift booked and protected
Loading dock Waste removal in booked slots
Common areas Floor and wall protection on route
Dust Screens, extraction, containment
Fire Isolation procedures via building management
Security Inductions, access cards, sign-in

Asbestos

Older Sydney office buildings may contain asbestos in ceiling spaces, floor tiles, service risers and plant rooms. The building's asbestos register is reviewed before work starts. Anything found in the scope is removed by a separately licensed asbestos removalist.

Waste and recycling

Office strip-outs generate highly recyclable waste — metal studs and ceiling grid, plasterboard, carpet tiles, cabling, glass, timber. Sorting on site reduces disposal cost and supports building sustainability reporting.

Where

The Sydney CBD, North Sydney and St Leonards, Macquarie Park, Parramatta and business parks across the city.

Costs

See the 2026 cost bands.

Call 02 6422 4201 or send the job details through.

More strip-out work

Lease Make GoodEnd-of-lease make-good to the standard in your lease, handed back so the landlord signs off and the bond comes home.
Retail & Shop Strip OutsShopfronts, fit-outs and signage removed in shopping centres and high streets, around trading hours.
Restaurant & Cafe Strip OutsCommercial kitchens, exhaust hoods, cool rooms, grease traps and dining fit-outs removed and made safe.
Warehouse & IndustrialMezzanines, office pods, racking, amenities and redundant plant removed from warehouses and industrial units.
Bathroom DemolitionBathrooms stripped to frame or slab for renovators and homeowners — tiles, screed, fixtures and membrane out, ready to rebuild.
Kitchen DemolitionKitchens removed cleanly — cabinetry, benchtops, splashbacks and appliances out, services capped, ready for install.
FAQs

Questions people ask before they commit

How long does an office strip-out take?

It depends on the floor area, the density of the fit-out and the building's work-hour rules. A small suite can take a few days; a full commercial floor often takes one to three weeks, especially where noisy works and waste removal are restricted to after hours.

What is removed in an office strip-out?

Typically partitions and glazed offices, joinery and kitchenettes, suspended ceilings and tiles where required, floor coverings, redundant data and electrical cabling, lighting added by the tenant, signage and supplementary air conditioning — leaving base building services and finishes as the lease or next fit-out requires.

Do you work with the building manager?

Always. Towers have work permits, induction requirements, lift and dock bookings, hot works permits, fire system isolation procedures and hours for noisy work. These are arranged before a start date is set.

What about the data cabling?

Redundant cabling is removed from ceilings, risers and floor boxes as scoped. Cabling that the landlord or incoming tenant wants retained is identified and tagged beforehand.